Llandudno Flyover, Wales

Fast, bespoke drainage solution for prestigious Welsh bridge

Eccles began working closely with MWT Civil Engineering earlier this year after they were awarded a refurbishment project on the prestigious Llandudno Flyover in North Wales.

As the refurbishment work commenced the flyover had to be closed to allow safe working for reconstructing the road and replacing the bridge expansion joints.

This meant that design solutions had to be conceived, manufactured and supplied quickly to avoid delays and minimise public disruption.

Our AquaDeck team undertook drainage design work for both kerb drainage units for surface water removal and we proposed our new SubDrain sub surface drainage system to provide secondary sub surface drainage on the structure.

SubDrain Channels

Chris Rothery, AquaDeck Project Director, met with the MWT construction team at their offices before the drainage works began:

“The design for our AquaDeck kerb drainage units was relatively straightforward, however the sub surface drainage layout proved to be more complicated because MWT were unsure exactly what they would find once the existing surfacing was removed.

“We agreed a couple of options on the SubDrain layout, fabricating a number of bespoke pieces so that MWT had flexibility on site once they began installation.

“We were conscious that the SubDrain channels were a critical path of works. Continuity and the avoidance of delays were key factors in this project; we were determined that MWT would not be delayed with the associated waterproofing and resurfacing works.”

Chris drove to site on a couple of occasions, including a Saturday morning visit to drop off additional special fabrications which MWT needed urgently – all part of the quality service and attention to detail that Eccles provide.

AquaDeck kerb drainage units and a bespoke SubDrain solution designed for flyover renovation works.
AquaDeck

Thanks to this fast turnaround the drainage installation and final project was a resounding success, with the works even finishing earlier than had been anticipated.

The flyover and bridge is now fully waterproofed and ready to continue carrying traffic for years to come.

This is a huge credit to the MWT team and our thanks go to Mike Thomas and John Seed for the opportunity to work with them on this prestigious project.

Discover the AquaDeck combined kerb drainage system

AquaDeck is designed specifically for use on bridges and elevated highways or where construction depths are limited. Manufactured with SmartGrip Technology and designed to be ultra strong and highly durable – AquaDeck is fully compliant to the Harmonised European Standard BSEN1433 and carries the new UKCA Mark, which is required by law by January 2025.

CLICK HERE TO FIND OUT MORE

Get in Touch Today

Fill in this quick form and one of our industry experts will be in touch.

Need help? Call our friendly support team on +44 (0)1922 613222

eccles-intelligent-access-drainage-solutions-white

Eccles (UK Foundries FE) Ltd, registered as a limited company in England and Wales under company number 02753977.
Registered Company Address: Portland Street, Walsall, West Midlands, WS2 8AA, UK.

ECCLES (UK FOUNDRIES FE) LTD STANDARD TERMS AND CONDITIONS OF SALE APPLY TO ALL SALES OF GOODS AND/OR SERVICES BY ECCLES (UK FOUNDRIES FE) LTD (TO THE EXCLUSION OF ANY OTHER TERMS), A COPY OF WHICH ARE AVAILABLE HERE.