ECCLES ENGINEERING: CASE STUDIES
Examples of our bespoke design and engineering
We have a strong track record working with contractors, merchants and specifiers to engineer cost-effective drainage solutions tailored for specific projects.
tower bridge, london
The Eccles Engineering team were approached by the City of London to offer a bespoke solution for replacing some of the older pedestrian walkway covers on one of the world’s most famous bridges.
MAILLART BRIDGE, SWITZERLAND
We supplied the stunning Maillart Bridge in Aarburg, Switzerland, with a bespoke AquaDeck bridge drainage solution, manufactured from stainless steel rather than the usual ductile iron.
STAFFORDSHIRE ACCESS ROAD IMPROVEMENT SCHEME
We designed and manufactured a unique expansion joint as part of our bespoke AquaDeck drainage solution to optimise the run-off of surface water on a new 130m stretch of viaduct.
PERRY BARR BUS DEPOT
We designed and manufactured specially fabricated access gratings for the engine and chassis wash down areas at Perry Barr Bus Depot.