CASE STUDIES

New look Matfen Hall

An eco-friendly drainage solution, that respects the sensitivities of the surrounding area, required for 25 new luxury cottages, built at the stunning Matfen Hall Golf and Spa Estate, Northumberland.

Read More »

M6 Juntion 10 Improvements

New drainage system required at M6 J10, one that can handle heavy weight loads from a variety of traffic types whilst safely removing surface and sub-surface water from the carriageways.

Read More »

London Gateway Port

High quality, cost-effective drainage and effluent treatment works, to be accessed by a variety of light and heavy traffic, needed for London Gateway Port’s new 7,218sqm state-of-the-art warehouse facility.

Read More »

Gatwick Airport

High standards of safety and a proven track record of innovative thinking needed to win Gatwick Airport’s road network improvement and ground transport connectivity contender.

Read More »

Amazon Distribution Centre

A smart civil engineering drainage solution, strong and durable to support very heavy loads of up to 600kN, required for Amazon’s new purpose-built 100,000 sqft distribution centre in Exeter,

Read More »

Alexander Stadium Development

Access and connectivity improvements specified at the famous Alexander Stadium, host of the 2022 Commonwealth Games, as part of a wider local infrastructure and transport improvement project.

Read More »